81 |
Solids circulation rate and static bed height in a riser of a circulating fluidized bed Cho D, Choi JH, Khurram MS, Jo SH, Ryu HJ, Park YC, Yi CK Korean Journal of Chemical Engineering, 32(2), 284, 2015 |
82 |
A MEASURE APPROACH FOR CONTINUOUS INVENTORY MODELS: DISCOUNTED COST CRITERION Helmes KL, Stockbridge RH, Zhu C SIAM Journal on Control and Optimization, 53(4), 2100, 2015 |
83 |
Modeling and control of solar-grade silicon production in a fluidized bed reactor Du J, Dutta S, Ydstie BE AIChE Journal, 60(5), 1740, 2014 |
84 |
Inventory pinch based, multiscale models for integrated planning and scheduling-part I: Gasoline blend planning Castillo PAC, Mahalec V AIChE Journal, 60(6), 2158, 2014 |
85 |
Inventory pinch based, multiscale models for integrated planning and scheduling-part II: Gasoline blend scheduling Castillo PAC, Mahalec V AIChE Journal, 60(7), 2475, 2014 |
86 |
Shale-to-well energy use and air pollutant emissions of shale gas production in China Chang Y, Huang R, Ries RJ, Masanet E Applied Energy, 125, 147, 2014 |
87 |
Combined methodology of optimization and life cycle inventory for a biomass gasification based BCHP system Wang JJ, Yang K, Xu ZL, Fu C, Li L, Zhou ZK Biomass & Bioenergy, 67, 32, 2014 |
88 |
Optimal supply chain design and management over a multi-period horizon under demand uncertainty. Part I: MINLP and MILP models Rodriguez MA, Vecchietti AR, Harjunkoski I, Grossmann IE Computers & Chemical Engineering, 62, 194, 2014 |
89 |
Economic model predictive control for inventory management in supply chains Subramanian K, Rawlings JB, Maravelias CT Computers & Chemical Engineering, 64, 71, 2014 |
90 |
Simultaneous production and distribution of industrial gas supply-chains Marchetti PA, Gupta V, Grossmann IE, Cook L, Valton PM, Singh T, Li T, Andre J Computers & Chemical Engineering, 69, 39, 2014 |